Case Studies

Evans Vanodine

Case Study
0
Case Study: Evans VanodineEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H Knight The Challenge: Production at the Preston site was predominantly manual intensive with over 160 different products produced on-site, human error and unreliable traceability was giving increasing concern. It was decided to automate the…

Feralco

Case Study
0
Case Study: FeralcoEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H KnightThe Challenge: The Aluminium Sulphates production facility at the Widnes site was some 40 years old and had reached the end of its working life. A new production facility was to be designed and constructed…

Gaskell & Evans

Case Study
0
Case Study: Gaskell & EvansEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H Knight The Challenge: A complete production facility was to be designed and installed for a global manufacturing company, the line would automatically assemble eight individual components, fill each unit, test and laser mark…

Rosehill Polymers

Case Study
0
Case Study: Rosehill PolymersEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H KnightLevel Crossing Plant Recipe Management / Data Logger The Challenge Following the setup of their unique and successful moulded level crossing ramp production plant, Rosehill Polymers were approached by SNCF, the French Railway company…

Reza Hygiene

Case Study
0
Case Study: Reza HygieneEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H Knight The Challenge: Having worked previously with Reza Hygiene they approached us to develop a PLC controlled centralised hygiene center which will deliver detergent, sanitizer and rinse water for washing applications in food or…

Northlink Ferries

Case Study
0
Case Study: Northlink FerriesEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H KnightSimonswood Automation has recently completed a complete upgrade of the HVAC systems running on the pair of Northlink Ferries running between Aberdeen and Shetland/Orkney in association with co-at marine Ltd of Glasgow.  The vessels…

London Underground

Case Study
0
Case Study: London UndergroundEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H KnightThe Challenge As part of London Underground’s ‘Cooling the Tube’ project, ventilation fans and associated dampers are placed at strategic points between stations to either extract the hot air from the tunnels or supply…

Karmelle Ltd

Case Study
0
Case Study: Karmelle LtdEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H KnightThe Challenge Due to the success of their liquid filling lines, Karmelle Ltd was approached by a major manufacturer to supply a dual head filling machine for printing inks.  Unfortunately, the company in question…

Co-at marine

Case Study
0
Case Study: Co-at marineEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H KnightChallenge: The ENSCO100 Drilling Rig was being refurbished and co-at marine were tasked to install the HVAC and HVAC Control System for the Accommodation Module. Initially ENSCO had specified the requirement for inverter speed…

AB World Foods

Case Study
0
Case Study: AB World FoodsEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H KnightThe Challenge The spice blending plant at the Leigh site was originally installed 10 years ago, and used a bespoke coded batching system which the client found they could not edit easily.  In…

Alfred H Knight

Case Study
0
Case Study: Alfred H KnightEvans VanodineFeralcoGaskell & EvansRosehill PolymersReza HygieneNorthlink FerriesLondon UndergroundKarmelle LtdCo-at marineAB World FoodsAlfred H KnightChallenge: Various Laboratory Supply and Extract Fans at the Alfred H Knight facility in St Helens need to run continuously 24 hours a day, 7 days a week for various sampling tests that…
Menu